
Based on the planning grid I created at PSG Studio, this simple form helps guide your project thoughts and planning. The PDF features a table of 8 columns, 5 rows, plus space to write labels.
The PDF is two pages allowing for easy double sided printing if desired. Please refer to your specific device for printing assistance.
Blog Posts
- Focus on Finishing
This listing is for a PDF download. Looking to purchase from outside the US? This design is also available at payhip.
